New signs popping
up on Clothall Road, this one is just a few meters from
the roundabout for Wallington Road, South Road
and Clothall Road.
This sign is letting us know that the "A507 Closed here
05:00h Sat 08 to 12:00h Sun 09 May" 2004
|
Taken Sat 8th May 2004
|
|
Taken
Sat 8th May 2004 |
This photo was
taken near one of the smaller site offices on the
A507 having
passed
the now closed Warren
Lane. We get the same "A507
Closed here 05:00h Sat 08 to 12:00h Sun 09 May" sign
and a "Max speed 30" sign. |
| Standing on top of where the water mains diversion pipe crossed
the A507 you can see a another "Max speed 30" sign along with
a sign to let you know the road has been diverted round to
the left and quickly back. |
Taken Sat
8th May 2004 |
|
Taken Sat
8th May 2004
Taken Tue
11th May 2004
Taken Tue
11th May 2004
Taken Tue
11th May 2004 |
This photo show
the route the A507 takes and the temporary road to keep traffic
moving while the temporary bridge is put
in place. |
| Looking at the
temporary bridge you can see bridge road level is higher
than the existing level. |
Taken Sat
8th May 2004 |
|
Taken Sat
8th May 2004 |
Only a small amount
has been dug out under the temporary bridge at the moment,
before works traffic can start using this it
will need to get a lot deeper. |
This photo show
how the temporary bridge lines up with the old A507 road
and again the bridge road height is higher than
the A507.
Our new photos now show the starts of the ramp to get the
old and new levels to meet.
The temporary
bridge also has the starts of a surface on it. We where
told that
it should be completed by Sat 15th May
04 or around that time so we will try to keep you up to date
with the photos. |
Taken Sat
8th May 2004
Taken Tue
11th May 2004
Taken Tue
11th May 2004 |
|
Taken Sat
8th May 2004
Taken Tue
11th May 2004
Taken Tue
11th May 2004 |
Standing looking south you can see the bridge and how the
level will have to come down to give works traffic access under
the A507. |
The temporary road
next to the A507 will be short lived once the temporary bridge
is in use. It will have to go to allow works
traffic under the bridge.
Now the newer
photo shows the start of the ramp up to the bridge height. |
Taken Sat
8th May 2004
Taken Tue
11th May 2004 |
|
Taken Tue
11th May 2004
Taken Tue
11th May 2004 |
Looking south
from the temporary bridge you can see the ground level
being taken down for the new bypass.
The dumper truck and bulldozer are on the lower level, which
is almost the deep and the 4x4 is tall.
The 4x4 also help
give you a scale of the kit being used and amount of earth
and chalk is to be moved. |
- Grid
- Grid
1
A505, Royston Road.
- Grid
2
A505, Royston Road, Wallington Road
- Grid
3
A507, Clothall Road
- Grid
4
Cut and fill tunnel
- Grid
5
Chalk Hill, Hatch Lane
- Grid
6
A1(M), A6141, Great North Road, London Road
|
|
|